Articles & News

Russell Lands Announces Next Collection of Waterfront Homesites in The Heritage


Published: 12.08.2022

Russell Lands announced that the City of Alexander City’s Planning Commission approved road construction plans for Phase 2 of The Heritage, a 1,500-acre residential development on Lake Martin. This is an extension of the already-completed Phase 1 of the Wicker Point peninsula. The plan for the construction of this extension was originally scheduled for a 2024 start date, but the timeframe was accelerated by more than a year due to the strength of the sales results in Phase 1 of The Heritage.

The second phase of The Heritage will consist of approximately 30 waterfront properties. Due to the Wicker Point peninsula’s unique bend in the middle of this phase, there will be lots that will face north, east, south, and west. Similar to those in Phase 1, the average lot size and waterfront footage will be substantially larger than homesites typically found on Lake Martin.

With the commencement of the new road construction, Russell Lands will be able to offer Phase 2 properties in the spring of 2023—well before the beginning of “lake season.”

As road work proceeds to Phase 2, the construction on the Wicker Point Golf Club golf course, clubhouse, and pro-shop continues. Sodding of the fairways should be substantially complete by the end of the year—including the sprigging of 16 of the 18 greens—with several holes already completed. Member play is set to begin in the fall of 2023.

Click here to learn more about The Heritage and stay up to date on all details regarding the next release of waterfront homesites.

See a sneak peak of Phase 2 and golf course progress photos here >

Download the full press release >

Previous Article Next Article
Download The Russell Lands App Download on the Apple App Store Get it on Google Play